AVERAGE INITIAL SET TIMES FOR WELD-ON PVC/CPVC SOLVENT CEMENTS*

 

Temperature Range
Pipe Sizes
1/2" to 11/4"
Pipe Sizes
11/2" to 2"
Pipe Sizes
21/2" to 8"
Pipe Sizes
10" to 15"
Pipe Sizes
15"+
60°-100°F
2 min
5 min
30 min
2 hrs
4 hrs
40°-60°F
5 min
10 min
2 hrs
8 hrs
16 hrs
0°-40°F
10 min
15 min
12 hrs
24 hrs
48 hrs

 * In damp or humid weather allow 50% more set time; extended set times are required for chemical applications.

 Note - Initial set schedule is the necessary time needed before the joint can be carefully handled.

AVERAGE JOINT CURE SCHEDULE FOR WELD-ON PVC/CPVC SOLVENT CEMENTS*

Relative Humidity 60% or Less
Cure Time
Pipe Sizes
1/2" to 11/4"
Cure Time
Pipe Sizes
11/2" to 2"
Cure Time
Pipe Sizes
21/2" to 8"
Cure Time Pipe Sizes 10" to 15"
Cure Time Pipe Sizes 15"+
Temperature Range During Assembly and Cure Periods
up to
160 psi
160-370 psi
up to
160 psi
160-315 psi
up to
160 psi
160-315 psi
up to 100 psi
up to 100 psi
60°-100°F
15 min
6 hrs
30 min
12 hrs
11/2 hrs
24 hrs
48 hrs
72 hrs
40°-60°F
20 min
12 hrs
45 min
24 hrs
4 hrs
48 hrs
96 hrs
6 days
0°-40°F
30 min
48 hrs
1 hr
96 hrs
72 hrs
8 days
8 days
14 days

* In damp or humid weather allow 50% more cure time; extended cure times are required for chemical applications.

 Note - Joint cure schedule is the necessary time needed before pressurizing system.

°C Conversion Chart

 

AVERAGE NUMBER OF JOINTS PER QT. OF WELD-ON CEMENT/PRIMER

Pipe Diameter
1/2"
3/4"
1"
11/2"
2"
3"
4"
6"
8"
10"
12"
15"
18"
Number of Joints
300
200
125
90
60
40
30
10
5
2-3
1-2
3/4
1/2

For Primer: Double the number of joints shown for cement.
These figures are estimates based on our laboratory tests. Due to the many variables in the field, these figures should be used as a general guide only.